HIQA inspects work sites for compliance with Title 19 of the NYC Administrative Code, NYC DOT Rules and Regulations, NYC DOT specifications and NYC DOT permit stipulations. ). 280 Broadway, 3rd Floor The location to which the application should be submitted depends on the location and type of construction-related work to be performed: Central Permit Office in ManhattanIn-person applications for non-emergency work, including work on all streets in Manhattan and on all critical streets in Brooklyn, Queens and the Bronx; all work to be performed for sewer and water system construction; and all capital project work, all utility work, all crane requests, and all full closures of sidewalks and roadways must be submitted only to the central Permit Office in Manhattan. Drawings are available in various formats including PDF (Acrobat), DGN (MicroStation Design File), DWG and DXF (AutoCAD Drawing), and other image types (TIF, DPR). NO EXCAVATION OR NOISY OPERATION PERMITTED DURING THIS TIME PERIOD. THE PERMITTEE MUST HAVE APPROVAL FROM NYCDOT STREET LIGHTING FOR INSTALLATION/REPLACEMENT OF POLES. ANY STORAGE OF MATERIAL OR STORAGE OF EQUIPMENT REQUIRES A SEPARATE PERMIT. The New York City Department of Transportation (NYC DOT) has adopted specifications and regulations stipulating how street work must be performed in order to minimize disruption and maintain the integrity of the street surface. USE OF NO STOPPING ZONES, NO STANDING ZONES AUTHORIZED PARKING, DIPLOMAT PARKING AND TAXI ZONES IS PROHIBITED. The citys, For design criteria, technical information, finishes, and color specification, refer to DOTs Bureau of Traffic Operations, Division of Street Lighting specifications. 3030 Third Avenue The applicant must satisfy all of the requirements listed in section 2-02(a) (3) of the. SPECIFICATION. Tel: (646) 252-5517 or (646) 252-5544, New York State Department of Transportation (NYSDOT) FULL WIDTH OF ROADWAY SHALL BE OPENED TO TRAFFIC WHEN SITE IS UNATTENDED. WORK 10 AM - 7 PM, MONDAY THROUGH FRIDAY.
DURING NON-WORKING HOURS PEDESTRIAN WALK WAY MUST BE MAINTAINED ON SIDEWALK OR ON ROADWAY. MUST COORDINATE WITH NYPD PRECINCT C.O. WHEN SCHOOL IS OUT MAINTAIN ONE 11 FOOT LANE FOR THRU TRAFFIC 7 AM TO 6 PM MON. Existing InfrastructurePermittees must not remove parking meters, traffic signs, street lights, street furniture, and similar items unless authorized on the permit. Based on the documents submitted, HIQA makes a preliminary determination as to whether the proposed location may be suitable for a canopy. (718) 391-1110 In order to apply for a permit, an applicant must first register in person with NYC DOT by submitting a completed Permittee Registration Application. The hold is to review the proposed work and set conditions for the work and/or restoration. A permit is required to place any construction trailer or similar structure in the street. If the applicant makes any changes to these authorized representative(s), he or she must update the Permittee Registration Application. THIS PERMIT MAY BE EXTENDED ONCE ONLY, FOR A PERIOD OF 14 DAYS AT $40. MAINTAIN 5 FEET FOR PEDS ON SIDEWALKS 15 FEET OR MORE IN WIDTH. The applicant submits a completed Canopy Authorization Application, which must include the following: Written approval from the owner of the property to which the canopy will be attached. Tel: (718) 875-7428
Brooklyn PERMITTEE IS PARTICIPATING IN CORE DRILLING PILOT PROGRAM. Thousands of miles of utility pipes, cables and other equipment are beneath the streets of New York City. All applications for construction or repair of a transformer vault must be accompanied by an electric utility company layout, and must comply with the minimum clearance requirements for transformer vaults unless an approval or waiver is obtained from the appropriate agency or utility (more information is available in. Tel: 718-780-8280 If the hold is not released, the applicant must contact DDC (DDC contact information is available in Appendix D, Other Agency and Utility Contact Information). PERMITTEE MUST NOTIFY NYPD/TRAFFIC MANAGEMENT CENTER 48 HOURS PRIOR TO CHANGING ANY SIGNS/MARKINGS. SECTION 6: LEGAL ENTITY PERSONNEL: OFFICERS/ DIRECTORS/ MANAGING AGENTS/ OWNER/ PARTNERS /MEMBERS /INDIVIDUALS, ETC. For Holds: (718) 222-7231 Contact information pertaining to the release of holds by NYC DOT can be found in Appendix C, NYC DOT Contact Information. Need a permit for a street-related project in NYC? The applicant can also request a new vault license for an existing vault by submitting SCARA plans and make a one-time license fee of $2 per square foot. 4.13 C OF THE DEPT. It provides both a thorough update to the guidance in previous iterations and a number of important additions: a new chapter on public programming in streets and public spaces; a host of new entries throughout the Process, Geometry, Furniture, and Landscape chapters; and substantially expanded coverage of several key topics, including bike lanes, inclusive design, and landscape selection and management. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPLUATED HEREIN. CLOSURE GRANTED AT REQUEST OF SCA LETTER. ONE LANE MAY REMAIN CLOSED, FOR CONCRETE CURING ONLY, FOR A MAXIMUM OF 48 CONSECUTIVE HOURS MONDAY TO FRIDAY IF WEEKDAY WORK HOURS ARE GRANTED, OR FROM 12:01AM SATURDAY THROUGH 6AM MONDAY IF WEEKEND OR NIGHTLY (7 NIGHTS) WORK HOURS ARE GRANTED. THE SIGN MUST BE PLACED AT A HEIGHT OF 7 TO 10 FEET AND STATE THE STREET TO BE CLOSED AND THE DATES AND TIMES OF THE CLOSURE. (IV) FIVE FEET OF RAIL ROAD TRACKS. 210 Joralemon Street, 8th Floor If the installed canopy fails final inspection, HIQA will reject the canopy maintenance permit and notify the applicant of the rejection. AND THAT THE PREVAILING SCALE OF UNION WAGES SHALL BE THE PREVAILING WAGE FOR SIMILAR TITLES AS ESTABLISHED BY THE FISCAL OFFICER PURSUANT TO SEC. Emergency work will not be placed on hold and shall proceed in accordance with Highway Rules, Section 2-11 (g). This list is provided as a reference tool, for informational purposes only, and is not an exhaustive list. 40 Worth Street 8th Floor Excavators use those markings to help identify underground facility locations in order to promote public safety and to prevent damage to public and private property. (16 NYCRR Part 753), Additional information can be obtained by contacting New York 811 at 800-272-4480, or visiting the New York 811 Website. Several forums are in place to provide advance notice of city capital projects. Management of New York City's street infrastructure is critical to the city's economic well-being and quality of life. Staten Island At crossings, the height of Accessible Pedestrian Signals must be reachable by a person using a mobility device, at a preferred height of 42 inches and a maximum height of 48 inches (see, Existing foundations at traffic signal locations in certain flood-vulnerable areas are being replaced with coastal storm foundations that incorporate a square concrete pedestal raising the electrical components above some flood depths. THIS STIP IS USED FOR WORK IN A TRAVEL LANE. Customer Service: (718) 579-6920, Brooklyn Any emergency work on a street that involves opening a utility access cover to gain access to an underground facility on a critical street during restricted hours requires an EAN. Permittees are responsible for maintaining the restoration for the duration of the "Guarantee Period" and must retain insurance for this purpose. Minimum slopes should be used wherever possible. Cranes may require permits from DOB in addition to NYC DOT. It is essential to call New York 811 before digging anywhere, including sidewalks and soil. Borough Permit OfficesIn-person applications for all other construction-related work can be submitted to the borough office in the borough in which the work is to be performed. Street Opening Permits are generally taken out by entities that need access to subsurface infrastructure, including utility companies and contractors, such as licensed master plumbers. View information on how to navigate and use NYCityMap. CONTRACTOR/PERMITTEE IS REQUIRED TO POST AND MAINTAIN ADVISORY SIGNS A MINIMUM OF48 HRS PRIOR TO CHANGING EXISTING PARKING REGULATION SIGNS TO APPROVED TEMPORARY CONSTRUCTION PARKING REGULATION SIGNS. THIS PERMIT INCLUDES THE OCCUPANCY OF THE ROADWAY AND OR SIDEWALK BY BARRIERS FOR THE PURPOSE OF SAFETY AND PROTECTION SURROUNDING THE OPEN UTILITY COVER WHILE MAINTAINING A SHUNT. WORK 10AM-3PM TO SET UP WORK AREA INCLUDES SHIFTING MOVING LANE TO CENTER STRIPED AREA AND ESTABLISING WORK ZONE ONCE WORK ZONE ESTABLISHED MAY WORK 24/7 WITHIN WORK ZONE/DRILLING ALL WORK IN ACCORDANCE WITH DRAWING MPT-3 8/28/07. The Office of Construction Mitigation and Coordination (OCMC) reviews all construction permit applications and develops construction activity, Completed Permittee Registration Application. Outlined below are the basic application procedures for Building Operations/Construction Activity Permits. Kew Gardens, NY 11424 HOWEVER IT MUST BE PRESENTED FOR EXTENSION NO LATER THAN 5 BUS DAYS PRIOR TO EXPIRING. Attn: Forestry See the Highway Rules, Section 2-02(j). Permanent RestorationUpon completion of work in a street, permittees are required to restore all street openings/excavations in accordance with the Highway Rules, Section 2-11(e) including, but not limited to, the following required restoration elements: Temporary RestorationIf street opening/excavation work remains unfinished at the end of the day, the permittee must perform temporary repairs in accordance with the Highway Rules, Section 2-11(e) including, but not limited to the following requirements: Street restoration following utility work, 18th Street and Irving Place, Manhattan. See Section 3.5.1 Holds for more information. WALKWAY MUST MEET NYCDOT SPECIFICATIONS. Copies of incorporation papers, licenses, and business certificate or filing receipt filed with the state of New York. SECTION 7: AUTHORIZED REPRESENTATIVES TO OBTAIN PERMITS. For questions, Mon-Fri 8:30 AM until 5:00 PM. To request release of a RED hold, the applicant must contact the HIQA borough office in the borough in which the proposed work is to be performed. ONE 11 FOOT LANE MAY REMAIN CLOSED FOR CONCRETE CURING ONLY FOR MAXIMUM OF48 HOURS. Apply for a parking permit. WORK ALLOWED 7 PM TO 6 AM NIGHTLY. MAINTAIN FOUR 11 FOOT LANES, TWO 11 FOOT LANES ON EACH SIDE OF THE EXISTING CENTER MALL. The instructions below apply to corporations, partnerships, joint ventures and individuals. RESTORE PAVEMENT AFTER SUFFICIENT TIME FOR CURING. The violation provides a property owner 75 daysto make repairs (see the Sidewalk Repairs section above for further details). ON STIP 109). NO WORK ON JULY 12, 2005. Fax: (718) 858-0069, Manhattan OCCUPY 15 FEET OF E/S CURB LANE. Capital Project by Other Agency (CPO) hold A CPO hold is automatically placed if the proposed permit location involves a current capital street reconstruction project or one that is being planned. Further information on permits is available in Chapter 3 Permits and Approvals. The ASHO in each borough releases Capital Project In-House (CPI) holds and Street Arterial Maintenance (SAM) holds. The completed Permittee Registration Application and other required documents must be submitted in person to the NYC DOT central Permit Office to complete the registration process. MAINTAIN 2 LANES NORTHBOUND AND 1 LANE SOUTHBOUND FROM 4PM-6PM M-F.
619 Maintenance and Protection of Traffic - New York State Department Regular Input and Attendance of Decision Makers at Coordination 30-30 Thomson Avenue, 4th Floor APPROVAL FROM NYCDOT HIQA BOROUGH OFFICE IS REQUIRED BEFORE WORK COMMENCES. Freeway, about 619-001: Temporary Positive Barrier (6 Sheets), about 619-002: Type III Construction Barricades (2 Sheets), about 619-004: Portable Temporary Wooden Sign Support, about 619-005: Details on Placement of Portable Temporary Rumble Strips, about 619-010: Work Zone Traffic Control General Notes, about 619-011: Work Zone Traffic Control General Tables & Legend, about 619-022: Shoulder Closure/Lane Encroachment, Official Electronic Standard Specifications and Standard Sheets website, 619-001: Temporary Positive Barrier (6 Sheets), 619-002: Type III Construction Barricades (2 Sheets), 619-004: Portable Temporary Wooden Sign Support, 619-005: Details on Placement of Portable Temporary Rumble Strips, 619-010: Work Zone Traffic Control General Notes, 619-011: Work Zone Traffic Control General Tables & Legend, 619-022: Shoulder Closure/Lane Encroachment. See Section 3.5.1 Holds for more information. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE SOUTHWEST QUADRANT OF THE INTERSECTION. VMS BOARD MUST BE REMOVED UPON COMPLETION OF THE APPROVED CLOSURE. From a block party, which opens a single block to community activities for a day, to Summer Streets, which dedicates over 7 miles of streets to pedestrians, runners, and cyclists, programming reminds New Yorkers that streets are public space, and should support active, healthy, and sustainable lifestyles. The completed application, affidavit, a stamped self-addressed envelope and a certified check made payable to NYC DOT for the permit fee (currently $70.00 for up to 300 linear feet) must be mailed to: The applicant submits permit application, proof of insurance (originally supplied during the registration process) and supporting documentation for review as to accuracy and completeness. Payment of the waiver request fee, as specified in the Highway Rules, Section 2-03, does not guarantee that approval to work during the embargo period will be granted. Attn: Forestry THIS APPLIES TO PERMITTEES AND ALL OF THEIR SUBCONTRACTORS. If there is no hold, the permit is issued to the applicant after appropriate payment is received. WORK HOURS 7 AM - 10 PM MON-FRI, AND 10 AM - 7 PM SAT AND SUN. 120-55 Queens Boulevard Poles (POL) hold A POL hold is automatically placed if the proposed permit work is for the installation of a pole on the sidewalk, which must be reviewed, approved and released by NYC DOT Street Lighting. Some of the activities covered include placement of materials, equipment and temporary structures on the street or movement of construction equipment across roadways and sidewalks. Staten Island, NY 10301 THE ROADWAY AND/OR SIDEWALK SHALL BE REPLACED IN-KIND. While Davit and Round poles are also standard poles, cost comparisons to the SS refer to the Octagonal. (212) 839-2475 Outlined below are the basic application procedures for Sidewalk Construction Permits. Permit Review is the process by which NYC DOT reviews permit applications and supporting documentation and makes determinations regarding the issuance of permits and permit stipulations. Fax: (212) 669-3844, New York City Office of Emergency Management (OEM) WHEN THE LANDSCAPE IS WITHIN THE RIGHT OF WAY OF A LIMITED-ACCESS ARTERIAL HIGHWAY, WRITTEN APPROVAL FROM THE NYCDOT OCMC- HIGHWAYS IS REQUIRED.WHEN THE LANDSCAPE IS WITHIN THE RIGHT OF WAY OF A PUBLIC. Permits (hazardous storage/operations) (718) 999-2457, New York City Department of Information Technology and Telecommunications (DoITT) 8:30 AM to 4:30 PM, Lower Manhattan (south of Canal Street) 47-40 21st Street - 7th Floor Special and separate procedures govern emergency work: one for utility access covers (including those for "manholes," valve covers and grates) and one for street openings/excavations. Suspension of Application Review NYC DOT may suspend the review of applications for permits pending: Refusal to Issue Permit NYC DOT may refuse to issue a permit to an applicant: Voiding and Reissuing of Permits. Registration applications should be printed on 8 1/2"x 14" paper. Office hours: Applications accepted, only from 8:00 AM to 11:30 AM; The second option is available for applicants who do not have the technology to use the above procedure.
Part II: 619 Standard Sheets | Department of Transportation Permeable Interlocking Concrete Paver (PICP), Provides space for walking, the most widely used mode of travel in New York City, Creates linkages to transit and connects neighborhood destinations, Facilitates straight and unobstructed pedestrian movement, free of vehicle conflicts except at intersections and driveways, With adequate width, can provide space for staying activities such as relaxing, shopping, eating, and socializing, Coordinate streetscape/utility work to minimize street cuts, On both sides of all streets that are 22 feet wide or wider. A statement that the canopy design and construction conforms to NYC DOT Standard Details of Construction. It seems that JavaScript is not working in your browser. With this cursor, users can click on the map to get information about a particular map layer. SPEED REDUCERS ARE PROPOSED FOR THE ROADWAY OF YOR WORK AREA. After obtaining HIQA's authorization, the applicant will be referred to the Permit Office in the borough in which the canopy will be located. YOU MUST SURVEY THE SITE. A copy of the form can also be foundin Appendix B, Forms. NYC Parks & Recreation Some of the requirements include, but are not limited to the following, where the applicant must: New York 811 is a nonprofit organization that acts as a communications link between utility companies and individuals planning any digging activity in the five boroughs of New York City and Nassau and Suffolk Counties on Long Island. DOT is also testing solar-powered lighting at select locations in flood-prone areas. SUPERINTENDENT OF HIGHWAY OPERATIONS (ASHO) OFFICE & OCMC-STREETS IN WRITING NO LATER THAN 48-HOURS PRIOR TO COMPLETION OF PAVING. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Any foundation material not meeting specifications must be removed. A full review will typically take between one or two business days. If the applicant does not accept the permit stipulations, he or she can request a review with the PM. To request release of an STP hold, the applicant must contact the HIQA borough office in the borough in which the proposed work is to be performed.